B. Data, documents, hardware, software
C. Data, hardware, software, procedures
D. Documents, hardware, people, procedures
Question 2 : Description of the system
A. The function and behavior of the computer-based system
B. The implementation of each system component is indicated
C. Detailed algorithm and system structure
D. Time required for system emulation
Question 3 : Rapid application development model
A: Another call of the component-based development model
B: A useful way when the customer does not specify the request clearly
C: High-speed assembly of linear sequence models
D: All of the above
Question 4 : The best way to consider the required evaluation is
A. Check the system model error
B. Ask customers to check the request
C. Send them to the design team and see if they have any interest
D. Use a list of test questions to check each request
Question 5 : Use the help tracing table
A. Debug program based on real-time error detection
B. Determine the representation of algorithmic implementations
C. Identify, control and track required changes
D. There are no items
Question 6 : Spiral software development model
A: Ending with the release of software products
B: Much more chaotic with increased models
C: Including evaluating software risks in each loop
D: All of the above
Question 7 : Component-based development model
A: Only suitable for computer hardware design
B: Can not support the development of reusable components
C: Based on object support techniques
D: Do not set cost effectively by measuring quantitative software
Question 8 : To build the system model, engineers must pay attention to one of the following limiting factors:
A: Assumptions and constraints
B: Objects and activities
C: Budget and costs
D: Schedule and event milestones
Question 9 : In business process engineering, three different architectures are tested
A: Technical infrastructure, data, applications
B: Financial, organizational and communication infrastructure
C: Report structure, database, network
D: Data structures, requirements, systems
Question 10 : Which component of business process technique is the responsibility of software engineer
A: Business scope analysis
B: Business system design
C: Product plan
D: Strategic information plan
Answer:
1. A
2 A
3. C
4. D
5. C
6. C
7. C
8. A
9. A
10. B
See more: