- Question 1. In risk identification, the failure to meet schedule is of risk type
- About human
- About estimates
- About request
- About organization
-
- Sentence 2. In the context of requirement analysis, two types of separation problems are
- bottom-up and top-down
- horizontal and vertical
- subordinate and superordinate
- There are no items
-
- Question 3. In a successful project use strategy
- Provide technical considerations of priority form before testing
- Specify the requirements in a quantitative way
- Interested in using independent test groups
- All answers are correct
-
- Question 4. In the scenario-based component analysis (Scenario based element) used for
- Architectural design
- Component design
- Design the theme
- Data design / class
-
- Question 5. In Software Capability Maturity Model (CMM), there are several maturity levels
- 3 levels
- 4 levels
- 5 levels
- 6 levels
-
- Question 6. In business process engineering, three different architectures are tested
- Technical infrastructure, data, applications
- Financial, organizational and communication infrastructure
- Report structure, database, network
- Data structures, requirements, systems
-
- Question 7. In measuring the effectiveness of DRE error elimination, the number of potential errors is
- Number of errors detected by customers
- All errors were discovered later
- All undiscovered errors
- All is wrong
-
- Question 8. In the schedule of the project Critical path is the road
- Is a single line
- There is the shortest time
- The longest time
- All of the above are true
-
- Question 9. The ISO standard for implementing guidelines for software is
- ISO 9001
- ISO 15288
- ISO 9000-3
- All is wrong
-
- Question 10. The quality evaluation criteria of an architectural design must be based on
- Access and reliability of the system
- Data and control of the system
- Functionality of the system
- Implementation details of the system
-